Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 一级A片国语普通话对白 | 国产老熟女高潮精品A片下载 | 日本午夜按摩技师一区二区三区 | 先锋影音av资源综合 | 无码人妻精品一区二区二秋霞影院 | 成年人黄色视频免费观看 | 久久人人澡人人添人人爽 | 9.1丨丨精品永久免费观看 | 综合网激情5月天 | 户外露出精品视频国产 | 蜜桃精品噜噜噜成人AV小说 | 帅哥无码内射电影 | 娇小亚洲与黑人XXXX | AV资源首页在线 | 性――交――性――乱A | 一区二区三区免费观看完整版日漫 | 中文字幕版无套内射 | 久久久久免费毛A片免费一瓶梅 | 免费看A片AAA片三黄白浆 | 精品无码一区二区三区在线蜜桃 | 麻豆视频免费在线观看 | 黄色视频在线免费播放 | 麻豆精品秘 国产传媒AV消防 | 17c波多野结衣无码蜜桃传媒 | 日韩精品无码一区二区三区蜜臀-百度 | 一级a毛片免费看久久久久 精品一区二区三区日日av | 搡老女人老太婆澡老太婆 | видео精品A片一区二区三区 | 亚洲精品无码久久久久 | 国产 传媒 无码 | 特级西西444www无码视频免费看 | 精品无码人妻一区二区欧美日韩 | 寡妇高潮一级毛片免费看30分网 | 亚洲精品乱码久久久久久蜜桃91 | 国产人妻人伦精品久久 | 国产成人无码精品污污污 | 国产乱人妻精品秘 入口 | 男女很黄很污在线观看 | 91丨九色丨白浆丨老牛 | 亚洲国产精品成人网站 |